Monday, April 24, 2017


Central – Latin America

Brazil, Angola 6,165km internet subsea cable loading officially starts

First submarine cable to cross the South Atlantic is set to be brought fully online in the second half of 2018 with a bandwidth of 100Gbit/s. The loading of a cable connecting Angola to Brazil has been initiated on the African shore as related marine surveys conclude. The South Atlantic Cable System (SACS) will measure […]